You will be creating a work breakdown structure (WBS) for the sample project outlined in the handout below. For this assignment, you must include the following items utilizing one of the WBS starter formats provided:

Work Breakdown Structure (WBS)

You will be creating a work breakdown structure (WBS) for the sample project outlined in the handout below. For this assignment, you must include the following items utilizing one of the WBS starter formats provided:

  1. WBS that contains all deliverables identified in the project scope
  2. WBS coding for each WBS component
  3. Each level one component (except project management) will be broken down at least one additional level with a minimum of three components.

Complete this assignment in a Word document, using the project scope and guidelines outlined in the following handout: Lesson 4 Assignment Handout.docx 

Instructions for submission: You have two options for creating your WBS:

Option 1: Create your WBS as a tree diagram.

Option 2: Create your WBS as an outline

 

attachment

 

Lesson4AssignmentHandout.pages